The challenge

How do you transform a conventional storage warehouse into a fully automated storage system that meets the high standards of a global player like Henkel?

Working on a solution together

Henkel’s facility in Bowling Green, Kentucky, aimed not only to embrace technological advancements but also to maximize storage capacity and accelerate processes. In partnership with Siemens, we developed an innovative storage system with an impressive 200,000 pallet spaces

0  +
pallet spaces
0  +
beams with welded brackets
0  months
total shipping duration, as planned
Innovation
Innovation

We used a 3D scanner to ensure perfect structural measurements.

Cost reduction
Cost reduction

New testing methods enabled us to switch from a 4.0 mm rail to a more efficient 2.5 mm rail, reducing material usage and lowering costs.

According to the schedule
According to the schedule

The complete delivery took 18 months, meaning the project proceeded entirely according to plan.

Media 1 / 12
Media 2 / 12
Media 3 / 12
Media 4 / 12
Media 5 / 12
Media 6 / 12
Media 7 / 12
Media 8 / 12
Media 9 / 12
Media 10 / 12
Media 11 / 12
Media 12 / 12

The result

Henkel’s Bowling Green facility now operates a state-of-the-art, fully automated storage system, ensuring faster and more efficient logistics processes. With this solution, Henkel once again takes the lead in automation and fast movement.

About Henkel

Henkel is a globally operating German company specializing in the production and distribution of hair care products, detergents, fabric softeners, adhesives, sealants and functional coatings. Several Henkel facilities in Europe have transitioned to fully automated storage systems.

Project partners

In collaboration with Siemens, this facility successfully transitioned to a fully automated storage system. NEDCON and Siemens share a long-standing partnership, and for this project, we once again combined our expertise.

Would you like advice from one of our experts?

Feel free to contact Jerry. He’ll be happy to assist you.

Contact form

Do you have a question or comment? Please fill out the form below and we will answer as soon as possible:

"*" indicates required fields

Name
Next project Development of a multi-channel distribution center TGW Logo View project NEDCON_-_TGW_-_Gap_1_4