On behalf of Federal Mogul, NEDCON has realized a project with an assembly lead time of only 14 weeks. The project consists of more than 50,000 pallet spaces with a load capacity of 750 kg per pallet location. The shelving systems can accommodate more than 60,000 boxes.
Read moreEven a great plan is just a plan....
until you make it real
An impressive project was realized in collaboration with Federal Mogul.
Shelving systems (combined with mezzanine floors) can accommodate 60,000 boxes. In addition, Federal Mogul has more than 50,000 pallet places with a load capacity of 750 kg per pallet site available.
The photos are our proof. A fantastic combination of pallet racks, shelving systems and mezzanine floors.